Skip to main content

Changes to Step #12

Edit by Paul Cronje

Edit approved by Paul Cronje

Before
After
Unchanged

Step Lines

+[title] Route the cables
+[* 2] Route the cables through the right gantry as shown in the pictures. First tighten them with a cable tie to the top motor bracket.
+[* 5] Add the cables of the two stepper motors to the harness and tighten the harness to the back of the right gantry as shown in the pictures.
+[* 1] Make sure the cables are not touching the GT2 belt.

Image 1

No previous image

New image

Added

Image 2

No previous image

New image

Added

Image 3

No previous image

New image

Added